用于混凝土变形缝,结构完成后,用水泥钉固定在墙面上,周边抹上聚氨酯密封胶防水,接水盒防止漏水后外溢。
For concrete deformation joint, after the structure is completed, the cement nail is fixed on the wall, and the periphery is covered with polyurethane sealant to prevent water leakage and overflow.
1.主体结构与交接变形缝,与附属结构接口处变形缝。接水盒在主体交接安装在每条变形缝的顶板和侧 墙位置。
不锈钢接水盒施工方案 变形缝接水槽 镀锌钢板接水盒不锈钢接水盒施工方案万一真出了大事,省得牵连到了我。
The 1. main structure and tunnel connection deformation joint, and the deformation joint at the interface of the subsidiary structure. The water receiving box is installed on the roof and side wall of each deformation joint in the main body.
不锈钢接水盒每块长2000mm,宽200mm,两翼宽各30mm,厚度为1mm。
Stainless steel water box each length 2000mm, width 200mm, wing width of 30mm, thickness of 1mm.
2、施工
2. Construction preparation
材料:1mm厚不锈钢接水盒、聚硫密封胶、密封胶、螺钉。 工具:电镐,电钻。
Material: 1mm thick stainless steel water box, polysulfide sealant, sealant, screw. Tools: electric drill.
3、施工工艺
3, construction technology
施工顺序:变形缝清理→涂抹聚硫密封胶→接水盒安装、固定→接水盒密封处理
Construction sequence: deformation joint cleaning, smearing polysulfide sealant, installing and fixing water box, sealing treatment of water box
1)、首先将变形缝清理干净,保证变形缝处混凝土面的平整。
1) first, clean up the deformation joint to ensure the concrete surface of the deformation joint is smooth.
2)、然后在变形缝内涂抹15mm深的聚硫密封胶。
2) and then apply 15mm deep polysulfide sealant in the deformation seam.
3)、接水盒应安装在顶板变形缝和侧墙变形缝上,安装时变形缝应位于接水盒中间位置。
段,你身为火云峰之主,门下众多,如此离开恐怕有些不妥吧。不锈钢接水盒施工方案 变形缝接水槽 镀锌钢板接水盒
3) the water box should be installed on the roof deformation joint and the deformation joint on the side wall, and the deformation joint should be located in the middle of the water box when the installation.
4)、接水盒两翼用间距为300mm的螺钉固定并用密封胶密封。在接水盒的搭接处应确保接
4) the two sides of the water box are fixed with 300mm screw and sealed with sealant. The joint of the water box should be connected
水盒的搭接长度不小于100mm,并且下侧的接水盒包住上侧的接水盒,使水不能从接水盒
The water box of the lap length not less than 100mm, and the water box on the side of the living water box connected below, the water from water box
漏出。
Leakage.
不锈钢接水盒施工方案 变形缝接水槽 镀锌钢板接水盒