快捷方式:发布信息| 收藏公司

不锈钢接水盒 变形缝接水槽 1mm厚不绣钢接水盒

产品/服务:
有效期至: 长期有效
最后更新: 2018-03-22 18:09
单价:
面议
最小起订量:
100 米
供货总量:
100000 米
立即询价

(发货期限:自买家付款之日起 天内发货)

诚信档案

  • 所在地区:河北
  •   
  • 收藏本公司 人气:894
    • 详细说明
    • 规格参数
    • 联系方式

    丧失了这种能力。
    这时龚光杰已穿回了长裤,上身却仍是光着膀子。两人神色间颇有惊惶之意,走到左子穆跟前。干光豪道:“,神农帮在对面山上,把守了山道,说道谁也不许下山。咱们见敌方人多,不得号令,没敢随便动手。”左子穆道:“嗯,来了多少人?”干光豪道:“大约七八十人。”左子穆嘿嘿冷笑,道:“七八十人,便想诛灭无量剑了?只怕也没没这么容易。”

    用于混凝土变形缝,结构完成后,用水泥钉固定在墙面上,周边抹上聚氨酯密封胶防水,接水盒防止漏水后外溢。
    For concrete deformation joint, after the structure is completed, the cement nail is fixed on the wall, and the periphery is covered with polyurethane sealant to prevent water leakage and overflow.
    1.主体结构与交接变形缝,与附属结构接口处变形缝。接水盒在主体交接安装在每条变形缝的顶板和侧    墙位置。

    不锈钢接水盒 变形缝接水槽 1mm厚不绣钢接水盒不锈钢接水盒两丈长的巨翅下。

    The 1. main structure and tunnel connection deformation joint, and the deformation joint at the interface of the subsidiary structure. The water receiving box is installed on the roof and side wall of each deformation joint in the main body.
    不锈钢接水盒每块长2000mm,宽200mm,两翼宽各30mm,厚度为1mm。
    Stainless steel water box each length 2000mm, width 200mm, wing width of 30mm, thickness of 1mm.
    2、施工
    2. Construction preparation
    材料:1mm厚不锈钢接水盒、聚硫密封胶、密封胶、螺钉。 工具:电镐,电钻。
    Material: 1mm thick stainless steel water box, polysulfide sealant, sealant, screw. Tools: electric drill.
    3、施工工艺
    3, construction technology
    施工顺序:变形缝清理→涂抹聚硫密封胶→接水盒安装、固定→接水盒密封处理
    Construction sequence: deformation joint cleaning, smearing polysulfide sealant, installing and fixing water box, sealing treatment of water box
    1)、首先将变形缝清理干净,保证变形缝处混凝土面的平整。
    1) first, clean up the deformation joint to ensure the concrete surface of the deformation joint is smooth.
    2)、然后在变形缝内涂抹15mm深的聚硫密封胶。
    2) and then apply 15mm deep polysulfide sealant in the deformation seam.
    3)、接水盒应安装在顶板变形缝和侧墙变形缝上,安装时变形缝应位于接水盒中间位置。


    蓝衣女子微一点头,一摆手示意韩立暂且下去。不锈钢接水盒 变形缝接水槽 1mm厚不绣钢接水盒
    3) the water box should be installed on the roof deformation joint and the deformation joint on the side wall, and the deformation joint should be located in the middle of the water box when the installation.
    4)、接水盒两翼用间距为300mm的螺钉固定并用密封胶密封。在接水盒的搭接处应确保接
    4) the two sides of the water box are fixed with 300mm screw and sealed with sealant. The joint of the water box should be connected
    水盒的搭接长度不小于100mm,并且下侧的接水盒包住上侧的接水盒,使水不能从接水盒
    The water box of the lap length not less than 100mm, and the water box on the side of the living water box connected below, the water from water box
    漏出。
    Leakage.

    不锈钢接水盒 变形缝接水槽 1mm厚不绣钢接水盒

    但你身上的天材地宝如此之多,倒不是不行的。
    百无聊赖之中,又去摘酸果来吃,忽想:“什么地方都找过了,反是这里没找过。别要远在天边,近在眼前。”酸果树丛,登时便摇了。树丛后光秃秃地一石壁,爬满了藤蔓,那里又有什么出路。但见这片石壁平整异常,宛然似一面铜镜,只是比之湖西的山壁却小得多了,心中一动:“莫非这才是真正的‘无量玉壁’?”当即拉去石壁上的藤蔓。但见这石壁也只平整光滑而已,别无他异。

     

    "};

    您可以通过以下类目找到类似信息:

     

    免责声明:以上所展示的信息由会员自行提供,内容的真实性、准确性和合法性由发布会员负责。中国生活在线对此不承担任何责任。

    友情提醒:为规避购买风险,建议您在购买相关产品前务必确认供应商资质及产品质量!