还是骤然间就化为一道血影。
段誉道:“我没门派。我受业姓孟,名讳上述下圣,字继儒。我专研易理,于说卦、系辞之学有颇深的造指。”他说的,是教他读经作文的。可是那老汉听到什么“易理”、“说卦、系辞”,还道是两门特异的武功,又见段誉折扇轻摇,颇似身负绝艺、深藏不露之辈,倒也不敢怠慢了,虽想不起武林中有那一号叫做“孟述圣”的人物,但既说他“有颇深的造诣”,想来也不见得是信口胡吹,便道:“既是如此,段少侠请稍候,我去通报。”
用于混凝土变形缝,结构完成后,用水泥钉固定在墙面上,周边抹上聚氨酯密封胶防水,接水盒防止漏水后外溢。
For concrete deformation joint, after the structure is completed, the cement nail is fixed on the wall, and the periphery is covered with polyurethane sealant to prevent water leakage and overflow.
1.主体结构与交接变形缝,与附属结构接口处变形缝。接水盒在主体交接安装在每条变形缝的顶板和侧 墙位置。
变形缝接水盒 变形缝接水槽 1.5mm不绣钢接水盒变形缝接水盒不过,付出的代价可不轻。
The 1. main structure and tunnel connection deformation joint, and the deformation joint at the interface of the subsidiary structure. The water receiving box is installed on the roof and side wall of each deformation joint in the main body.
不锈钢接水盒每块长2000mm,宽200mm,两翼宽各30mm,厚度为1mm。
Stainless steel water box each length 2000mm, width 200mm, wing width of 30mm, thickness of 1mm.
2、施工
2. Construction preparation
材料:1mm厚不锈钢接水盒、聚硫密封胶、密封胶、螺钉。 工具:电镐,电钻。
Material: 1mm thick stainless steel water box, polysulfide sealant, sealant, screw. Tools: electric drill.
3、施工工艺
3, construction technology
施工顺序:变形缝清理→涂抹聚硫密封胶→接水盒安装、固定→接水盒密封处理
Construction sequence: deformation joint cleaning, smearing polysulfide sealant, installing and fixing water box, sealing treatment of water box
1)、首先将变形缝清理干净,保证变形缝处混凝土面的平整。
1) first, clean up the deformation joint to ensure the concrete surface of the deformation joint is smooth.
2)、然后在变形缝内涂抹15mm深的聚硫密封胶。
2) and then apply 15mm deep polysulfide sealant in the deformation seam.
3)、接水盒应安装在顶板变形缝和侧墙变形缝上,安装时变形缝应位于接水盒中间位置。
密室的四角,各有一名白发苍苍的老者手握一杆碧绿色法旗,盘膝而坐。变形缝接水盒 变形缝接水槽 1.5mm不绣钢接水盒
3) the water box should be installed on the roof deformation joint and the deformation joint on the side wall, and the deformation joint should be located in the middle of the water box when the installation.
4)、接水盒两翼用间距为300mm的螺钉固定并用密封胶密封。在接水盒的搭接处应确保接
4) the two sides of the water box are fixed with 300mm screw and sealed with sealant. The joint of the water box should be connected
水盒的搭接长度不小于100mm,并且下侧的接水盒包住上侧的接水盒,使水不能从接水盒
The water box of the lap length not less than 100mm, and the water box on the side of the living water box connected below, the water from water box
漏出。
Leakage.
变形缝接水盒 变形缝接水槽 1.5mm不绣钢接水盒
英鹭如此思量着,回首对车队其他声招呼一声,督促车队再加快几分速度的赶路。龚光杰也顾不得裤中那只貂儿兀自从左腿爬到右腿,又从右腿爬上,忙抢上将那人扶起,貂儿突然爬到了他前阴的要紧所在。他“啊”一声大叫,双手忙去抓貂,那人又即摔倒。
"};